The goal of the project was to connect to an existing 36” water main and extend it to 20th street East for future City expansion. The 36” system tied into many other water mains which required close coordination with the USACE, City of Lancaster, Los Angeles County Waterworks Department and other users. In this project, a large pipe was backfilled with Portland cement slurry by utilizing an on-site mobile batch plant to insure a quality backfill and a better finished product that would provide the most longevity for the City of Lancaster.